March 21, 1923 to April 23, 1923
Steamer Elizabeth Smith of Davison Sand Company
Docked March 21, 1923 off April 12, 1923 after general repairs
big Job
Tug Mike
Doughtery docked March 30, 1923
Good
Friday completely overhauled from stem to stern finished May 5, 1923
March 24, 1923
takeing down Boom and A frame
off Collier #4
New Pump boat #3 for Mines Dept # 149
finished
March 26, 1923
3 Pieces Oak for American Steel and Wire in the
River March 28, 1923 � 10 x 12 x 38
March 26, 1923
Beacon repairs to Drain board
and pantry shelves
One of the old Dock Hulls used for a float sunk
Docked & repaired had a RR tie through the bottom
April 4, 1923
April 4, 1923
Steamer Ranger repairs to Wheel
steering cylinder - slides - wheel chain braces keyed - Nigger box and
repairs of this sort all around Wm. Shaw Captain
Saturday April 14, 1923
several men droped the
Ways Pump boat to Lovedale tipple trying to save a Loaded Barge
Click