April
4, 1923 to April 18, 1923
April 4, 1923
working on a loose rail # 1-2 track
4th
- 5 - 6 - 1923 bulkheading in old Hull of Steamer Pearsy
damaged by Steamer Voyager on the 2nd
shiped 3 new 16
ft Yawls for Converse Company April 12, 1923
Steamer Voyager
scrubing - furnace work - Boiler work repairing B.D. and
side E.R. bulkheads April 11, 1923
Steamer
Sunshine Docked Friday April 13, 1923
High Water
April 14 - 15, 1923 men pushing out drift and tying up spar
triped and broke
April 19,
1923 Dynamiting of wreck of Model barge V Below Ways
Mr. J.
Frank Tilley Direction
April 20,
1923 geting 8 oak logs out of a Barge at Dock 6
April 16 to 23,
1923 Cleaning up yards and washing mud after high water left
everything in bad shape the water was up to RR track and
repairing tracks - ( same job )
April 18,
1923 unloaded two cars of Oak on RR sideing
Pennsy 292048 - B & O 137933
Click