KIPKE GENEALOGY

This document was kindly shared by Marc Shafer (whose father was a 298th member).

Transcribed by Bob Kipke (March 2013) – Attempts have been made to maintain the original formatting, within my limited HTML capabilities, and the differences between a 1940’s typewriter and a modern computer keyboard. Formatting (inconsistent in original) such as capitalization, underlining, punctuation, use of quotes, etc. have been maintained. A typo is noted by the use of [sic] other errors are probably my own.  For ease of recognition, names are in a bold red font.

 

 

DEPARTMENT OF THE ARMY

THE ADJUTANT GENERAL’S OFFICE

WASHINGTON

 

 

 

 

 

DEPARTMENTAL RECORDS BRANCH, A.G.O.

HISTORICAL RECORDS SECTION

ROOM MB-858 PENTAGON

 

ENBN-298-0.7 (26637) Master Jul – 298th Engr C Bn


 

 

Date  1 March 1945

Place Birkesdorf, Germany F 103478

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Bn Hq moves to Birkesdorf

Bn. Hq opens at Birkesdorf at 0900.

Co. A 8 ½ Squads road Maint.

½ Squad Sec. & Maint of Bailey Bridge

F 106451

Co. B 6 Squads Road Maint.

½ Squad W/P Sec. Gressenich

½ Squad W/P Sec. Scheyenhutte.

½ Squad Quarry Guard F 015415

½ Squad Bridde [sic] Guard F 006423

1 Squad Cleaning Equip. Co. Area.

Co. C Attached to 4th Cav. Group.

Route “B”

Relieved at approx. 1600 hrs.

Relieved at approx. 1600 hrs. [sic – this line duped]

 

 

 

 

 

 

 

 

 

Date 2 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co. A 8 Squads Road maint. & sweeping for [sic]

1 Squad Cleaning Equipment Co. Area.

 


 

 

(Con’d)

Date  2 March 1945

Place Birkesdorf, Germany F 103478

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. B 8 Squads Road maint. Route “B”

1 Squad Cleaning Equipment Co. Area.

Co. C Attached to 4th Cav. Group.

 

 

 

 

 

 

 

 

 

Date 3 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co A 7 Squads Road maint. & sweeping road & shoulders for mines. F 149520.

1 Squad Marking minefield F 150531

1 Squad Cleaning Equipment. Co. Area.

Co. B 8 Squads Road maint.

( 3 Squads Birkesdorf – Arnoldsweiler )

( 3 Squads Arnoldweiler [sic] – Boundary )

( 2 Squads Boundary – Ellen )

1 Squad Cleaning Equipment Co. Area.

Co. C Attached to 4th Cav Group Esch.

 

 

 

 

 

 

 

 

 

Date 4 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co. A 8 Squads Road Maint. (Coord. F 142516 Railroad 2 Squads.)

(3 Squads Railroad Morschenich )

(3 Squads Morschenich )

Co. B 7 ½ Squads Road Mint:

( 1 Squad Birkesdorf Unt Koltenich)

( 2 Squads Birkesdorf – Arnoldweiler [sic] )

3 Squads Arnoldsweiler Ellen to N. intersection)

( ½ Squad Arnoldsweiler – Duren)

( 1 ½ Squad NE intersection Arnoldsweiler [sic]

Co. C Attached to 4th Cav. Group Esch.

 

 

 

 

 

 

 

 

 

Date 5 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co. A 8 Squads Road Maint:

( 3 Squads F 142516 RR )

2 Squads RR Morschenich )

 3 Squads Morschenich Coord F 179528 (

 

 

( Con’d )

Date  5 March 1945

Place Birkesdorf, Germant [sic] F 103478

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. B 8 Squads Road Maint.

( 1 Squad Birkesdorf – Arnoldsweiler )

( 1 Squad Birkesdorf – Unt – Koltenich )

( 2 Squads Arnoldsweiler N.E. Boundary )

( 1 Squad Arnoldsweiler – Duran )

( 3 Squads Arnoldsweiler – Ellen – N. E. Boundary )

Operating quarry at F 148493.

Co. C Attached to 4th Cav. Group Esch.

 

 

 

 

 

 

 

 

 

Date 6 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co. A 9 Squads Road Maintenance:

( 3 Squads Coord F 142516 Railroad. )

( 3 Squads Railroad – Morschenich )

( 3 Squads Morschenich – F 179528 )

Co. B 8 ½ Squads Road Maint:

( 2 1/3 Squads Birkesdorf – Arnoldsweiler )

3 Squads Arnoldsweiler RJ. )

( 3 R J Ellen – Arnoldsweiler )

Co. C Attached 4th Cav. Group – Roggendorf )

Direct hit by shell on C.P.

Malone killed, Capt Sewell, Sgt Russell Steidel, & Whitney injured.

 

 

 

 

 

 

 

 

 

Date 7 March 1945

Place Birkesdorf, Germany F 103478

 

 

 

 

 

 

 

 

 

Co. A 9 Squads Road maintenance & Patrol

3 Squads.

6 Squads RR 149520 – 179528.

Co. B 9 Squads Road Maintenance & Patrol F 179528 to Elsdorf.

Schaff & detail patrolling other roads in area.

Co. C Attached 4th Cav. Grp. Roggendorf.

1300 Bn. Hqs, Co. A & Co. B move to following locations:

Bn Hqs Vic Manheim F 204560

Co. A Morschenich

Co. B Etzweiler

1530 Bn Hqs opened at new C.P.

Co. C Attached 4th Cav. Gp. Roggendorf.

 


 

 

(Con’d)

Date  8 March 1945

Place Manheim, Germany F 204560

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A 9 Squads Road Maint & Sign Posting

( 3 Squads Taking down “B” route signs in road net – Ellen – Arnoldsweiler net and adjacent roads )

( 3 Squads Roads Golzheim – Buir – 2155-10 – 180528 – Buir)

( 3 Squads Unt Koltenich – Oberzier – 110540 )

Co. B 8 ½ Squads Road Maint:

(3 Squads 179528 – 178547 )

( 3 Squads 178547 – Etzweiler )

( 2 Squads Etzweiler – Elsdorf )

(½ Squad Detail at Rubble pit – Ellen.

Co. C Attached 4th Cav. Group Stresberg F 320779.

 

 

 

 

 

 

 

 

 

Date 9 March 1945

Place Manheim, Germany F 204560

 

 

 

 

 

 

 

 

 

Co. A 7 Squads Road Maint:

( 3 Squads 180528 Buir – 210504 & Buir to Golzheim)

( 3 Squads Unt Koltenich – Oberzier – 110545 )

( 1 Squad Oberzeir – Ellen )

2 Squads Posting Route “B” signs on Rt “B”

Co. B 8 ½ Squads Road Maint:

( 3 Squads 179528 to 178547 )

( 2 ½ Squads 178547 to Etzweiler )

( 2 ½ Squads Etzweiler to elsdorf [sic])

( ½ Squad Detail at rubble site Ellen )

Co. C Attached to 4th Cav. Group Straberg.

 

 

 

 

 

 

 

 

 

Date 10 March 1945

Place Manheim, Germany F 204560

 

 

 

 

 

 

 

 

 

Co. A 7 ½ Squads Road Maint:

( 2 Squads Golzheim – Blatzheim )

 


 

 

Date  10 March 1945

Place Manheim, Germany F 204560

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

( 3 Squads Golzheim – Buir – Blatzheim )

( 2 ½ Squads Blatzheim – Kerpen )

( ½ Squad Bailey Bridge guard 256527 )

( ½ Squad W/P Sec. 226512 )

( ½ Squad Cleaning Equipment Co. Area. )

Co. B 8 ½ Squads Road Maint:

( 2/12 Squads 178548 – Elsdorf )

( ½ Squad 143599 – Elsdorf )

( 2 ½ Squads Buir – 178548 )

3 Squads Blatzheim – Widdendorf )

½ Squad – Rubble pit – Elsdorf.

Co. C Attached 4th Cav. Group Straberg to be relieved today.

 

 

 

 

 

 

 

 

 

Date 11 March 1945

Place Manheim, Germany F 204560

 

 

 

 

 

 

 

 

 

Co. A 6 Squads Road Maintenance:

( 3 Squads Blatzheim – Buir – Golzheim )

( 3 Squads Blatzheim – Kerpen )

1 Squad Co. Area.

½ Squad W/P Sec Horren 276584

½ Squad W/P Sec. Blatzheim 226512

½ Squad Treadway Bridge Guard Site #7

½ Squad Sec. & Maint of Bailey 256527

Co. B 8 ½ Squads Road Maint:

2 ½ Squads F 178548 to Elsdorf

½ Squad F 145600 to Elsdorf

3 Squads Widdendorf – Blatzheim

2 ½ Squads F 178548 to Buir.

½ Squad Loading detail in rubble pit Elsdorf

Co. C. Rest & Recreation Blatzheim

 

 

 

 

 

 

 

 

 

Date 12 March 1945

Place Manheim, Germany F 204569

 

 

 

 

 

 

 

 

 

Co. A 6 Squads Road Maint: “ Route “W” Blatzheim – Kerpen.

1 Squad Patrolling road Golzheim – Elsdorf

½ Squad W/P Sec. Horren.

½ Squad W/P Sec. Blatzheim

½ Squad Guarding Treadway Material F 114444

½ Squad Sec. & Maint. of Bailey Br. 256527

 

( Con’d )

Date  12 march 1945

Place Manheim, Germany F 204560

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. B 3 Squads Road Maint: Route “D” Kerpen-Lechenich.

6 Squad In Area ( moving )

Co. C Road & Recreation Moved to Lechenich.

Co’s H&S Lechenich F 317543

B Gyminch

C Lechenich

H&S Moved at 1215 Arrived at 1300.

 

 

 

 

 

 

 

 

 

Date 13 March 1945

Place Lechenich, Germany F 317453

 

 

 

 

 

 

 

 

 

Co. A 7 Squads Road Maint. & Repair:

( 3 Squads Burr to Blatzheim to Widdendorf )

( 3 Squads Blateheim to Derpen )

( 1 Squad Buir to Elsdorf )

½ Squad W/P Sec. Horren

½ Squad Guarding tredway [sic] material F 114444

½ Squad Sec. & Maint. of Bailey Bridge F 256527 )

Co. B 7 ½ Squads Road Main & Repair:

( 2 Squad [sic] Kerpen – Gymich )

( 3 Squads Gymich Lechenich )

( 2 ½ Squads Lechenich Norvenich )

½ Squad Gravel pit detail Gymnich F 299489

1 Squad Cleaning Equipment Co Area.

Co. C 6 ½ Squads Road Maint:

½ Squad Bailey Bridge Guard F 320450

½ Squad Bailey Bridge Guard F 355430

½ Squad Bailey Bridge Guard F 341455

1 Squad Cleaning Equipment Co. Area.

 

 

 

 

 

 

 

 

 

Date 14 March 1945

Place Duisdorf, Germany F 510353

 

 

 

 

 

 

 

 

 

Co. A 8 Squads

½ Squad Guarding treadway Equipment – F 114444

½ Squad W/P Sec. F 530349

½ Squad W/P Sec. Blatzheim.

Co. B 9 Squads Resting

Co. C 9 Squads Resting

Co’s H&S A,B, & C. move to Duisdorf, Germany at 0800 hours 14 March Lv. 0800 Ar. approx.. 1000 hours.

 

 

Date  15 March 1945

Place Duisdorf, Germany F 510354

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A 7 Squads Road maintenance:

( 4 Squads F 439314 to Weilerwist )

( 3 Squads Meil – Grossverwich – Weilerwist )

½ Squad Guarding treadway equip. F 114444

½ Squad W/P Sec. Blatzheim

½ Squad W/P Sec. F 530349

½ Squad Cleaning Equip. Co. Area.

Co. B 3 Squads Road Maintenance Villip – Gimmersdorf – Oberbachen – Mehlem – Site Improving road.

1 Squad Vic. Mehlem

1 Squad Improving road & entrance to site

4 Squads Cleaning Equipment Co. Area.

Co. C 8 Squads Road maintenance:

( 3 Squad F 439314 to Stadt – Meckenheim [sic]

( 2 Squads Duisdorf to F 437315 )

( 3 Squads Lengsdorf to Stadt Menkenheim )

1 Squad Co. Area.

2200 Co. B launched 7 LCVP’s at Oberwinter.

2315 Mission completed.

 

 

 

 

 

 

 

 

 

Date 16 March 1945

Place Duisdorf, Germany F 510353

 

 

 

 

 

 

 

 

 

Co. A 7 Squads Road Maintenance:

( 4 Squads Heimersheim – Miel )

( 2 Squads Miel – Grossevernich )

( 1 Squad Grossernich – Weilerwist )

½ Squad W/P Sec. Blatzheim

½ Squad W/P Sec. F 530349

½ Squad Guarding treadway Equip. F 114444

½ Squad Cleaning Equipment Co. Area.

Co. B 6 Squads Cleaning Equipment Co. Area.

3 Squads Launching one LCVP. & improving site Oberwinter.

( 6 Squads Stadt Meckenheim 439314 )

( 1 Squad Stadt Meckenheim – Lengsdorf )

1 Squad Stadt Mechenheim – Epenich )

1 Squad Cleaning Equipment Co. Area.

Co. C Moves out for Oberwinter approx.. 1700 to construct heavy Ponton raft.

 


 

 

 

Date  17 March 1945

Place Place Duisdorf, Germany F 510353

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cavalry Group

Co. B 3 Squads Assisting Jepson Oberwinter

3 Squads Miel Hiemershien.

2 Squads Miel Wielerwiss

½ Squad W/P Sec. F 350349

½ Squad Guarding treadway equip. F 114444

Co. C 5 ½ Squads Preparing approach to Huy Ponton Raft F 6292231

2 ½ Squads Constructing Huy Ponton Raft.

1 Squad Cleaning Equip Co. Area.

1400 S-2 & S-3 sections move from Duisdorf to Adv. C.P. at Oberwinter. 626244.

1800 LCVP site #3 opened

Site #1 Hvy Ponton Raft

Site #2 LCVP 3 Boats

Site #3 LCVP 7 Boats.

 

 

 

 

 

 

 

 

 

Date March 18 1945

Place Oberwinter, Germany 626244

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cav. Group.

Co. B 3 Squads Assisting Jepson with operation of LCVP’s Sites #2, #3.

3 Squads Miel – Hiemerzhiem

2 Squads Miel Wielerwis.

½ Squad W/P Sec. F 350349

½ Squad Guarding Treadway Equip F 114444

Co. C 1 ½ Squads Maint. & Assisting with operations of Rafts. Hvy Ponton Raft Site #1.

4 ½ Squads Cleaning Equipment & resting for night work Co. Area.

3 Squads Improving roads at Hvy Ponton Site 629231.

 

 

 

 

 

 

 

 

 

Date March 19, 1945

Place Oberwinter Germany 626244

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cav. Group.

Co. B 3 Squads Assisting Jepson at LCVP

5 Squads Road maintenance

½ Squad W/P Sec. F 530349

½ Squad Guarding treadway Equip F 114444

Co. C 3 Squads Operating ferry

6 Squads Co. Area.

 


 

 

 

Date  20 March 1945

Place Oberwinter, Germany F 626244

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cav. Group

Co. B 5 Squads Road maintenance:

( 3 Squads Weilerwist – Modrath )

( 1 ½ Squads Heimerzheim – Brenig )

( ½ Squad Duisdorf – Endenich – Lenesdorf )

3 Squads Assisting Jepson with operation of LCVP’s Sites #1, #4

½ Squad Guarding treadway Equip F 114444

½ Squad W/P Sec. F 530349

Co. C 4/12 Squads Constructing & operating Heavy Ponton raft. F 614304

4 ½ Squads Co. Area.

Heavy Ponton Raft at Site #1 5 boats (Ponton) propelled by 1 LCVP. Later LCVP was taken away and one power boat was substituted for it. A 22 H motor was placed in each of the two.

Heavy Ponton Raft at Site #4 6 ponton boats reinforced by 4 40’ steel “I” beams Powered by 1 LCVP.

 

 

 

 

 

 

 

 

 

Date 21 March 1945

Place Oberwinter, Germany F 626244

 

 

 

 

 

 

 

 

 

Co. A attached to 4th Cav. Group.

Co. B 3 Squads Assisting Jepson with operation of LCVP’s Sites #1, #4

½ Squad W/P Sec. F 530349 Opened 1300 20 Mar

½ Squad W/P Sec. F 605272

5 Squads Road Maintenance

Co. C 5 Squads Cleaning equipment Co. Area.

( 3 ½ Squads at site #4.)

( 1 ½ Squads at Site #1 )

 

 

 

 

 

 

 

 

 

22 March 1945

Place Oberwinter, Germany F 626244

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group

Co. B 5 Squads Road maintenance

3 Squads Assisting Jepson

½ Squad W/P Sec. F 530349

½ Squad W/P Sec. F 605272

Co. C 4 Squads Maintaining & operating:

( 2 ½ Squads Site #4. )

1 ½ Squads Site #1 )

 


 

 

( Con’d )

Date  22 March 1945

Place Oberwinter, Germany F 626244

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. “A” Attached to 4th Cav. Group

Co. “B” 5 Squads Road Maintenance

3 Squads Assisting Jepson

½ Squad W/P Sec. F 530349

½ Squad W/P Sec. F 605272

 

 

 

 

 

 

 

 

 

Co. C 5 Squads Co. Area.

4 Squads Maintaining & operating heavy Ponton ferrys.

 

 

 

 

 

 

 

 

 

Date 23 March 1945

Place Oberwinter, Germany F 626244

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group

Co. B 3 Squads Standing by to assist Jepson with operation of LCVP’s

½ Squad W/P Sec. F 530349

½ Squad W/P Sec. F 605272

Co. C 2 ½ Squads Maint & Operation of HVY Ponton Raft. site 4

1 ½ Squads Maint. & Operation of Hvy Ponton R [sic] Raft Site #1 5 Squads Co. Area.

 

 

 

 

 

 

 

 

 

Date 24 March 1945

Place Oberwinter, Germany F 626244 & Konigswinter, Germany

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cav. Group.

Co. B ½ Squad W/P Sec. F 530349

½ Squad W/P Sec. F 605272

7 Squads Road Maint:

(2 Squads Konigswinter – Rhondorf)

(3 Squads Rhondorf – Honnef)

(2 Squads In loop)

1 Squad Co. Area.

Co. C 4 Squads Operating ferrys

(2 ½ - #1)

(1 ½ - #4)

5 Squads Co. Area.

1300 Bn Hq’s moved to new location in Konigswinter

1400 Bn C.P. opened at 1400 hrs.

Co. “C” moves to

 


 

 

 

Date  25 March 1945

Place Konigswinter, Germany

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group – Oberkassel

Co. B 7 Squads Road Maintenance:

( 2 Squads Konigswinter Rhondorf )

( 2 Squads Rhondorf – Honnef )

( 3 Squads Loop )

½ Squad W/P Sec. F 530349

½ Squad W/P Sec. F 605272

1 Squad Cleaning Equipment Co. Area.

Co. C 8 Squads Road Maintenance

“E” Route from Konigswinter – Fittenbach

1 Squad Co. Area.

 

 

 

 

 

 

 

 

 

26 March 1945

Place Konigswinter, Germany

 

 

 

 

 

 

 

 

 

Co. “A” Attache [sic] to 4th Cav. Gp. Oberkassel

Co. “B” ½ Squad W/P Sec. F 605272

½ Squad W/P Sec. F 530549

7 Squads Road Maint.

(2 Squads Konigswinter – Rhondorf)

(2 Squads Rhondorf – Honnef)

(3 Squads Loop)

1 Squad Cleaning Equip. Co. Area.

Co. “C” 8 Squads Road Maintenance Route “E”

Konigswinter – Ittenbach

1 Squad Co. Area. D-7 in Co. Area.

 

 

 

 

 

 

 

 

 

Date 27 March 1945

Place Konieswinter, Germany

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group.

Co. B 8 Squads Road Maint.

( 7 Squads Honnef – Autobahn )

( 1 Squad Honnef – Konigswinter )

1 NCO & 3 men. W/P Sec. F

½ Squad Mine team

Co. C 7 Squads Road Maintenance:

( 2 Squads Route “E” F 657310 – Autobahn. [sic]

( ½ Squad Bridge guard 707293 )

( ½ Squad Quarry Guard 695275 )

3 Squads Autobahn.

2 Squads Route “E” Koninswinter – 657310

1 Squad Cleaning Equipment Co. Area.

 


 

 

 

Date  28 March 1945

Place Konigswinter, Germany & Fluterschen, Germany

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. “A” Attached to 4th Cav. Group.

Co. “B” Moving to vic. Wallrod at 0700 hrs. at Coord F 988280

Responsible for clearing roads Altenkirchen – Hachenburg – Hochstenbach Altenkirchen.

Co. “C” 7 Squads Road Maint:

½ Squad Quarry Detail F 695274

½ Squad Bridge Guard – F 707293

1 Squad Holding party W/Lt. Scott.

( 1 Squad “E” Route forward of Autobahn )

(1 Squad “D” Route forward of Autobahn )

( 4 Squad [sic] Route “E” from River to Autobahn. )

D-7 W/Co B

0600 Co. B moves to Wallrod.

1500 Co’s H&S & C move to Fluterschen.

 

 

 

 

 

 

 

 

 

Date 29 March 1945

Place Fluterschen, Germany F 9222299

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group F 877411

Co. B Road Maintenance & clearing streets Altenkirchen.

Co. C ½ Squad Bailey Bridge Sec. F 707293

1 Squad Billeting Detail Marienberg.

5 Squads Cleaning Equipment Co. Area.

2 ½ Squads Preparing

 

 

 

 

 

 

 

 

 

Date 30 March 1945

Place Fluterschim, Germany F 9222299

Herborn Germany.

 

 

 

 

 

 

 

 

 

Co. A Attached 4th Cav. Gp. F 877411

Co. B Working in new area – Posting Route.

“D” & “E” signs Hachenbush – Herborn.

Moved to new C.P.

Co. C 7 Squads Road Maint and clearing streets of rubble in Altenkirchen.

2 Squads Improving drainage in Altenkirchen

Co. “B” moved to new C.P. during morning

Co H&S moved to Herborn at 1300

Co. C moved to Herborn arrived 2200

Water point installed at 426335

Bailey Bridge G 426335

 


 

 

 

Date  31 March 1945

Place Herborn, Germany G 402316

 

 

IN

OUT

FROM

TO

REMARKS

 

 

 

 

 

 

 

 

 

Co. A Attached to 4th Cav. Group.

Co. B ½ Squad Sec. Bailey Bridge G 089302

½ Squad W/P Sec. G 426335

7 Squads Road Maint.

1 Squad Co. Area.

Co. “C” 8 Squads Road maintenance & Sweeping for mines

1 Squad Co. Area.

Detail constructing Route “E” signs.

( 3 Squads Allendorf – Liebenschied )

( 3 Squads Rabenschied – Haiger )

( 2 Squads Patrolling roads in area. )

 

Transcribed by Bob Kipke – June 2013

 


Please e-mail me at the address below.
This is not a button.

KIPKE GENEALOGY HOME