This document was kindly shared by
Marc Shafer (whose father was a 298th member). Transcribed by Bob Kipke (March 2013)
Attempts have been made to maintain the original formatting, within my
limited HTML capabilities, and the differences between a 1940s typewriter
and a modern computer keyboard. Formatting (inconsistent in original) such as
capitalization, underlining, punctuation, use of quotes, etc. have been
maintained. A typo is noted by the use of [sic] other errors are probably my
own. For ease of recognition, names
are in a bold
red font. |
DEPARTMENT OF THE ARMY THE ADJUTANT GENERALS
OFFICE WASHINGTON |
|
DEPARTMENTAL RECORDS
BRANCH, A.G.O. HISTORICAL RECORDS SECTION ROOM MB-858 PENTAGON |
ENBN-298-0.7
(26637) Master Jul 298th Engr C Bn |
|
Date 1
November 1944 Place 131133 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. A (-44
men) Training preparation of training sites & roads. 44 men receiving
training in river crossing. Storm-boats. |
|
|
|
|
|
|
0800 |
|
|
Co. B 1
Platoon W/Jepson 2 Platoons preparion [sic] at training sites & roads. |
|
|
|
|
|
|
0800 |
|
|
Co. C 1
Platoon attached to Jackrabbit 2 Platoons
preparing training sites & roads. Water Point
installed in Vic. Andenne. |
|
|
|
|
|
|
|
|
|
Date 2
November 1944 Place 131133 |
|
|
|
|
|
|
0800 |
|
|
Co. A 14 men
storm boat training Heavy ponton
raft training. |
|
|
|
|
|
|
0800 |
|
|
1 Platoon
with Jepson 1 Platoon
training with Co. C till 1200 hrs. 1 Platoon
repairing roads |
|
|
|
|
|
|
0800 |
|
|
Co. C 1
Plat. attached to Jackrabbit 2 Plat.
Infantry support raft training. |
|
|
Date 3 Nov.
1944 Place 131133 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. A Heavy
Ponton Raft training |
|
|
|
|
|
|
0800 |
|
|
Co. B 1
Plat. with Jepson 1 Plat.
repairing roads 1 Plat.
Training with Co. C |
|
|
|
|
|
|
|
|
|
Co. C 1
Plat. returns from 297th at 1400 hrs. 2 Plats. steel treadway bridge training. W/P in Vic.
Andenne. |
|
|
|
|
|
|
|
|
|
Date 4 Nov.
1944 Place 131133 |
|
|
|
|
|
|
0800 |
|
|
Co. A Heavy Ponton-raft training. |
|
|
|
|
|
|
|
|
|
Co. B 1
Plat. with Jepson 1 Plat. road repair. 1 Plat. helping 181st unload equipment. |
|
|
|
|
|
|
|
|
|
Co. C 44 men
storm-boat training Co. (44 E.M. ) heavy Ponton rafts. |
|
|
|
|
|
|
|
|
|
Date 5 Nov.
1944 Place 131133 |
|
|
|
|
|
|
0800 |
|
|
Co. A Boom
Erection. |
|
|
|
|
|
|
|
|
|
Co. B 1
Plat. Jepson 2 Plats. road repair. |
|
|
|
|
|
|
|
|
|
Co. C (-44
men) Heavy Ponton rafts 44 men
storm-boat & half-boat training. |
|
|
|
|
|
|
|
|
|
Date 6 Nov.
1944 Place 131133 |
|
|
|
|
|
|
0800 |
|
|
Co. A 2
Plats Heavy Ponton Bridge. 1 Plat
Erection of Boom. |
|
|
Date 6 Nov.
1944 Place 131133 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. B 2
Plats. LCVP 1 Plat. Road
Repair. |
|
|
|
|
|
|
0800 |
|
|
Co. C 3
Plats. Heavy Ponton Bridge. |
|
|
|
|
|
|
|
|
|
Date 7 Nov.
1944 Place
131133. |
|
|
|
|
|
|
0800 |
|
|
Co. A Steel
Treadway Bridge 10 men
storm-boat training. Co. B 2
Plats LCVP 1 Plat. Road
repair. Co. C
Infantry Support Raft. 10 men
storm-boat training. |
|
|
|
|
|
|
|
|
|
Bn.
completed Stream-crossing training and a report was submitted to Jackpot Cos
A & C took training in the erection of booms, Steel treadway bridge,
heavy ponton bridge & rafts, and storm-boat and half-boat training. Bn.
was bivouacked in ANDENNE and the training sites A & B were located a
few miles East of the Meuse R. in the Vic. of Ben Ahin.
Co. B had two plats. experimenting in the loading,
unloading, and launching of LCVPs. The navy unit Jepson worked with Co. B.
The remaining platoon from Co. B was involved in repair and maint. of road at training site. |
|
|
|
|
|
|
|
|
|
Date 8, Nov.
1944 Place 131133 |
|
|
|
|
|
|
0800 |
|
|
Bn. moves
from Andenne to Raeren. |
|
|
|
|
|
|
1300 |
|
|
Arrive at
Raeren Bn left
Andenne at 0800. The order [sic] The order of march was B,C,
H&S, A. and Heavy March Unit. Andenne, HUy [sic] Liege, Herve, Lonzlin, & Raeren |
|
|
Date 9 Nov.
1944 Place 967358 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Bn. Leaves
Raeren on motor march to Vic. Zweifall. |
|
|
|
|
|
|
1100 |
|
|
Bn arrives
in Vic. Sweifall [sic]. Co. A
takes over blocks #4, #5. Co. C takes
over defensive position #11. Co. B
takes over blocks #1-#2-#3. Bn attached
to 3rd Armored Div. until 1200 hrs friday [sic]. Location of
Posts #1 009356
Co. B #2 008356
Co. B #3 007367
Co. B #4 004374
Co. A #5 010390
Co. A #11 013364
Co. C. |
|
|
|
|
|
|
|
|
|
Date 10 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A Defending road-blocks #4 - #5. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Defending road-blocks #1 2 3. |
|
|
|
|
|
|
0800 |
|
|
Co. C
Defending defensive Position #11 Bn. attached
to 3rd Armored Div. until 1200 hrs. Attached to 4th
Div. effective 1200 hrs. |
|
|
|
|
|
|
|
|
|
Date 11 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A
Defending road-blocks #4-#5. |
|
|
|
|
|
|
0800 |
|
|
Co. C
Defending Defensive position #11. |
|
|
|
|
|
|
1400 |
|
|
Receive
orders from Prim to withdraw Co C from position #11. Releif
[sic] to take place during the afternoon. Co. C to fill holes and move back
into position in the Vic. of their |
|
|
Date 11 Nov.
1944 Place 967358 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
|
|
|
present C.P.
and be the reserve Co. |
|
|
|
|
|
|
1700 |
|
|
Co. C withdrews [sic] from position as per orders. Retires to
Co. C.P. |
|
|
|
|
|
|
|
|
|
Post
Officers 11Nov.44 #1 Lt. Manspeaker #2 Lt Stafford #3 Lt Hollis relieved by Donovan #4 Lt Seibert #5 Lt Bruno Lt Kahofer |
|
|
|
|
|
|
|
|
|
Date 12 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A Defending road-blocks #4-#6. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Defending road-blocks #1-#2-#3. |
|
|
|
|
|
|
0800 |
|
|
Co. C In
reserve Attached to 4th Division. |
|
|
|
|
|
|
|
|
|
Date 13 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A Defending road-blocks #4-#6. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Defending Road-blocks #1-2-3. |
|
|
|
|
|
|
0800 |
|
|
Co. C In
reserve. |
|
|
|
|
|
|
|
|
|
Date 14 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A Defending road-blocks #4-#6. |
|
|
|
|
|
|
0800 |
|
|
Co. B Defending
road Blocks #1-2-3. |
|
|
Date 14 Nov.
1944 Place 967358 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. C In
reserve. |
|
|
|
|
|
|
|
|
|
Date 15 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A Defending road-blocks #4-#6. |
|
0800 |
|
|
Co. C In
Reserve. |
|
0800 |
|
|
Co. C
relieves Co B at Posts #1-3-2. |
|
1200 |
|
|
Co. B to
send 5 man patrol to investigate enemy positions during the afternoon. |
|
|
|
|
|
|
|
|
|
Date 16 Nov.
1944 Place 967358 |
|
|
|
|
|
|
0800 |
|
|
Co. A
Defending road blocks #4-5. |
|
0800 |
|
|
Co. B In
reserve (to stage demonstration) |
|
0800 |
|
|
Co. C
Defending road-blocks #1-2-3. Bn Hdgs
starts moving to new bivouac at Raeron. Last of the letter Cos was pulled
out of the line at approx.. 1645 and Cos left for
new biv. at Raeron immediately following their
release from the line. Bn Hgds was opened in Rigenon at approx. 1900 hrs.
Things were badly screwed up in our new billets. 3000 mento
house. |
|
|
|
|
|
|
|
|
|
Date 17 Nov.
1944 Place RAEREN |
|
|
|
|
|
|
0800 |
|
|
Co. A In
Reserve |
|
0800 |
|
|
Co. B In
Reserve |
|
0800 |
|
|
Co. C In Reserve. |
|
|
Date 18 Nov.
1944 Place 853308 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. A Road
& Bridge Maint. & repair |
|
0800 |
|
|
Co. B Road
& Bridge Maint. & repair |
|
0800 |
|
|
Co. C Road
& Bridge Maint. & repair Culvert
being constructed at K 894363 5-36 armico
[sic] culverts. |
|
|
|
|
|
|
|
|
|
Date 19 Nov.
1944 Place 853308 |
|
|
|
|
|
|
0800 |
|
|
Co. A Road
& Bridge maint. & repair |
|
0800 |
|
|
Co. B Road
& Bridge maint. & repair |
|
0800 |
|
|
Co. C Road
& Bridge maint. & repair Culvert
being constructed at K 894353 5-36 armico [sic] culverts. Bailey
Bridge converted D S to T S begun 1300 hrs. 18 Nov. completed 1700 hrs. 19
Nov. 1944 Co. B project K 894363. |
|
|
|
|
|
|
|
|
|
Date 20 Nov.
1944 Place 853308 |
|
|
|
|
|
|
0800 |
|
|
Co. A Road
& Bridge Maint & repair |
|
0800 |
|
|
Co. B Road
& Bridge Maint & repair |
|
0800 |
|
|
Co. C Road
& Bridge Maint & repair Culvert
being constructed at K 894363 5-36 armico [sic] culvert. |
|
|
|
|
|
|
|
|
|
Date 21 Nov.
1944 Place 903345 |
|
|
|
|
|
|
0800 |
|
|
Co: A Road
& Bridge Maint & repair |
|
0800 |
|
|
Co. B Road
& Bridge Maint & repair |
|
0800 |
|
|
Co: C Road
& Bridge Maint & repair |
|
1300 |
|
|
Bn. Hgs
moved from its location in Raeren to its new location at Friesenrath. Bn Hq.
arrived at its new location at 1330 hrs. Culvert being constructed at K
894363 |
|
|
Date 22 Nov.
1944 Place 903345 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. A Road
& Bridge Maint. & repair |
|
0800 |
|
|
Co. B Road
& Bridge Maint. & repair |
|
0800 |
|
|
Co. C Road
& Bridge Maint. & repair Relieved of
work on culvert but maintaining Bailey Bridge (same site) |
|
|
|
|
|
|
|
|
|
Date 23 Nov.
1944 Place 903345 |
|
|
|
|
|
|
|
|
|
[NOTE
handwritten on the page is Thanksgiving] |
|
|
|
|
|
|
0800 |
|
|
Co. C 1st
Plat. Bridge Job at Mulartshutte (Road Patrol) E.M. 26 2nd Plat.
Road job draining & ditching from Mulartschutte to Rott. 3rd Plat. road job drainage and ditching from Vicht to Mulartshutte. Co. A Road
& Bridge Maint. & repair. Co. B 1
Plat. attached to 294. 2 Plats. road & Bridge Maint. |
|
|
|
|
|
|
|
|
|
Date 24 Nov.
1944 Place 903345 |
|
|
|
|
|
|
0800 |
|
|
Co. A Road
Maint. & repair (Kornelimunster to Vicht.) Bridge guard
100 yds of experimental road repair on road Kornelimunster to Vicht. Bridge
at Vicht. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th |
|
|
|
|
|
|
0800 |
|
|
1 Plat.
building D S Bailey Br. at Mulartshutte 1 Plat.
assisting 1st Platoon in building Bailey Bridge at Mulartschutte Culvert
Guard on road From Walheim to Rotgen. Bridge Guard at Rott. 1 Plat.
Bridge guard at Mulartschutte Road Patrol. Quarry guard at Stolberg Road Job
on road from Rotgen to Zweifall. |
|
|
|
|
|
|
1245 |
|
|
Bridge which
was started at 0730 by Co. C opened to traffic. Class 40 DS Bailey 60
span two 20 ramps. Located in
Mulartshutte. |
|
|
|
|
|
|
1700 |
|
|
Bridge
completed at 1700 hrs. |
|
|
Date 25 Nov.
1944 Place 903345 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th |
|
0800 |
|
|
Co. C 1
Plat. dismantling timber trestle under Bailey at
Mulartshutte. 1 Plat. Road
repair & maint. Rott to R.J. on Kornelimunster Rotgen road. 1 Squad
Cleaning equipment ½ Squad
Quarry guard Stolberg. 96 E.M
available (working) 2 Squads
Patch work on road Rott to Zweifall. |
|
|
|
|
|
|
0800 |
|
|
1 Plat. dismantling timber trestle bridge at Vicht. 2 Plats. (-)
Road Maint Kornelimunster Vicht. ½ Squad Bailey Bridge guard at Walheim. |
|
|
|
|
|
|
|
|
|
Date 26 Nov.
1944 Place 903345 |
|
0800 |
|
|
Co. A 1
Plat. Dismantling timber trestle bridge at Vicht. 2 Plats.
Road maint. Kornelimunster to Vicht. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th |
|
|
|
|
|
|
0800 |
|
|
Co. C 1
Plat. dismantling timber trestle at Mulartshutte. 1 Plat. Road
maintenance Rott-Zweifall. 3 Squads road maint. on
road Rott to R.J. Kornelimunster Rotgen Highway. 1 Squad cleaning equipment.
½ Squad guard at Quarry at Stolberg. |
|
|
|
|
|
|
|
|
|
Date 27 Nov.
1944 Place 903345 |
|
|
|
|
|
|
0800 |
|
|
Co. A 1
Plat. dismantling timber trestle bridge at Vicht. 1 Plat. road maint. Korn Blimunster Breining. 1 Squad in Co
Area. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th |
|
|
|
|
|
|
0800 |
|
|
Co. C 1
Plat. road maint. and
ditching Sweifall [sic]-Rott
. 1 Plat. road maint. between Rott-Rotgen
Kornelimunster road. |
|
|
Date 27 Nov.
1944 Place FRIESENRATH
903345 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
|
|
|
2 Squads
Maint of Roads Brenning Zweifall. 1 Squad digging out culvert-Vicht. |
|
|
|
|
|
|
|
|
|
Date 28 Nov.
1944 Place
FRIESENRATH 903345. |
|
|
|
|
|
|
0800 |
|
|
Co. A 3
Squads preparing timber-trestle site at Vicht. N. of Vicht. 1 Squad
cleaning equip. 2 Squad Rod
Maint. Kornelimunster to Vicht. 3 Squads Road Maint. Breining to Vicht. ½
Squad Guard at Rotgen Dam. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th Engr. (C) Bn. |
|
|
|
|
|
|
0800 |
|
|
Co. C 2
Squads Road maint. Zweifall to Rott. 1 Squad Cleaning equip. ½ Squad Quarry
Guard at Stolberg. 1 Squad s
[sic] Road Maint. Rott to R.J. Rott. to R.J.
Rotgen-Kornelimuster. ½ Squad Guard at Mulartshutte Bridge. ½ Squad Removing debris from beneath bridge at Vicht. 2 Squads
road maint. Zweifall R.J. Rotgen Kornelimuster. 1 Squad preparing site
for timber trestle at Rott. |
|
|
|
|
|
|
|
|
|
Date 29 Nov.
1944 Place 903345 |
|
|
|
|
|
|
0800 |
|
|
3 Squads
Road Maint. Kornelimunster-Vicht. 2 Squads Preparing site for Const. of
timber-trestle bridge Vicht 2 ½ Squads
Road Maint. Mulartshutte to Walheim. ½ Squad Dam Guard Rotgen dam 1 Squad
Cleaning Equip. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th. |
|
|
|
|
|
|
0800 |
|
|
Co. C 1
Squad lowering trestle at Mulartshutte. 1 Squad Cleaning equip. ½ Squad Cleaning debris from beneath bridge N. of Vicht. 3
Squads road maint. Rott to R.J. on ROtgen [sic] Kornelimuster. ½ Squad Spreading gravel on road. 1 Plat.
(-) Const. timber bridge Rott. ½ Squad Quarry Guard Stolberg |
|
|
Date 30 Nov.
1944 Place 903345 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
|
|
Co. A 1
Plat. construction of Timber trestle bridge at
Vicht. 1 Plat. (-)
Road Maint. Kornelimuster Breinig Walheim-Mulartshutte 2 Squad
Dam Guard Rotgen Dam. NOTE: 1
Plat. in reserve to relieve the bridge Plat. at 1500hrs. Relieving Plat. works
on bridge 1500-2900 [sic]. |
|
|
|
|
|
|
0800 |
|
|
Co. B
Attached to 294th. |
|
|
|
|
|
|
0800 |
|
|
1 Plat. (-)
Completing construction of timber bridge Vic. Rott. ½ Squad Quarry Guard.
Vic. Stolberg Until 1500 hrs. ½ Squad
Preparing site for const. of Timber trestle Bridge. Vic. Mulartshutte. 2 ½ Squads
Road Maint. Rott to Rotgen-Kornelimuster Road. |
|
||||
|
||||
Transcribed
by Bob Kipke April 2013 |