This document was kindly shared by
Marc Shafer (whose father was a 298th member). Transcribed by Bob Kipke (March 2013)
– Attempts have been made to maintain the original formatting, within my
limited HTML capabilities, and the differences between a 1940’s typewriter
and a modern computer keyboard. Formatting (inconsistent in original) such as
capitalization, underlining, punctuation, use of quotes, etc. have been
maintained. A typo is noted by the use of [sic] other errors are probably my
own. For ease of recognition, names
are in a bold
red font. |
DEPARTMENT OF THE ARMY THE ADJUTANT GENERAL’S
OFFICE WASHINGTON |
|
DEPARTMENTAL RECORDS
BRANCH, A.G.O. HISTORICAL RECORDS SECTION ROOM MB-858 PENTAGON |
ENBN-298-0.7
(26637) Master Jul – 298th Engr C Bn |
|
Date 1 Sept
1944 Place 755615
|
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0830 |
Bn – Co. A |
|
Bn. moves
from Coord 755615 to Coord 282015 |
|
|
|
|
|
1200 |
|
|
|
Bn arrives
at new bivouac area at Coord. 282015. |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Squad
security at W.P. 6 Squads
maint ‘ sec. of Bridge over Aisne River |
|
|
|
|
|
|
1300 |
Co. B |
|
2nd &
3rd Plat. sweeping for mines & posting signs in
assgnd area. |
|
|
|
|
|
|
1300 |
Co. C |
|
2nd & 3
Plat. sweeping for mines & posting signs in
assigned area. |
|
|
|
|
|
|
|
|
|
Date 2 Sept
1944 Place 282015
& 397404 |
|
|
|
|
|
|
0800 |
Co. C |
|
1st &
3rd Plat. sweeping for mine & Posting signs 1 Sqd. with
Lt. Scott for new Biv. area. 1 Sqd. birdge [sic] maint. at Montecourt. |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd
security at W.P. at Listel 325275 1 Sqd
security at W.P. at Braines 932928 |
img03382 |
|
Date 2 Sept
194 [sic] Place 282015
& 397404 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. B |
|
2 Plat. sweeping for mines and posting signs. 1 Plat. relieved from Jackpot Security. |
|
|
|
|
|
|
1345 |
All Co’s |
|
Leave biv. area 282015 for new area. Bn arrives
at new biv. area. Coord. 397404. |
|
|
|
|
|
|
|
|
|
Date 3 Sept
1944 |
|
|
|
|
Place
682713. |
|
|
|
|
|
2130 |
|
All Co’s |
|
Arrive in
new biv. area at Coord. 682713. |
|
|
|
|
|
0115 |
|
Co. C |
|
Started
construction of Class 40 Bailey Bridge at Coord 700709 |
|
|
|
|
|
0500 |
|
Co. C |
|
Finished
construction of Bridge. |
|
|
|
|
|
|
|
|
|
Date 4 Sept
1944 Place 751854 |
|
|
|
|
|
|
1345 |
All Co’s |
|
Bn leaves
biv. area fro [sic] new
area. |
|
|
|
|
|
1515 |
|
All Co’s |
|
Bn arrives
in new biv. area at Coord. 751854. |
|
|
|
|
|
|
|
|
|
Date 5 Sept
1944 Place 751854 |
|
|
|
|
|
|
|
Co. A |
Assgd. Areas |
1st Platoon
– Jackpot Sec. 1st Sqd of
2nd Plat. Jackstone W/P Sec.
2nd. Sqd. – 2nd Plat. Bivouac. 3rd
Sqd. 3rd Plat. W/P Sec. 3rd
Plat. in reserve 15th Engr.
River crossing for Inf. |
img03383 |
|
Date 5 Sept
1944 Place 751854
|
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
|
Co. C |
Assgd. Areas |
1 Sqd of 1st
Plat. in Support of Co. B 1st sqd. of 3rd Plat. support of Co. B
1sqd of 3rd Plat. Security for 1129th 2nd Plat. Const. Timber Trestle bridge. |
|
|
|
|
|
|
|
S-4 |
Assgd. Area |
All of Co.
Building steel treadway bridge at Hastiere |
|
|
|
|
|
1500 |
|
Co. A |
Bivouac |
1 Sqd.
returned from W/P Security (Braines) |
|
|
|
|
|
|
0200 |
Co. A |
B. Co.
Bridge Job. |
Bulldozer
& Wrk, Trlr. |
|
|
|
|
|
0800 |
|
Co. C |
Biv. |
1 Sqd.
reported back from Co. B Support. |
|
|
|
|
|
|
|
|
|
Date 6 Sept
1944 Place
751854. |
|
|
|
|
|
|
|
Co. A |
Assgd. Areas |
1st Plat.
Jackpot Sec. 1st Sqd. of 2nd Platoon W/P Sec. 2nd &
3rd Sqds of 3rd Plat. Bivouac 3rd Platoon 15 Engr. Reserve. R-4 with Co. B |
|
|
|
|
|
|
0800 |
Co. C |
Assgd. Area |
1 Sqd. of
1st Plat. Bridge Site 2nd Plat. At
bridge site. 1 Sqd. from
3rd Plat. 11120th Sec. |
|
|
|
|
|
|
1120 |
Co. C |
Bridge Site |
2 Sqds. went
out in support of Co. B. |
|
|
|
|
|
|
|
|
|
Date 7 Sept.
1944 Place 875885 |
|
|
|
|
|
|
0930 |
Co’s B, C,
H&S |
|
Co’s move to
new bivouac area at 875885. Arrived at new Biv. |
img03384 |
|
Date 8 Sept
1944 Place 875885
|
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0100 |
Co. A In
Support of 15 Engr. Bn |
S-3 |
Started the
dismantling of Inf. Support Bridge at Coord. 978921. |
|
|
|
|
|
0800 |
|
Co. A |
S-3 |
Dismantling
of Inf. Support Bridge completed. 1 Sqd.
security at W/P at 870870 2 Sqds in area. |
|
|
|
|
|
0800 |
|
Co. B |
|
1 Platoon
security & maint. of bridge at Hastiere. 1 Plat.
Security for Jackpot. 1 Plat. in area. |
|
|
|
|
|
0800 |
|
Co. C |
|
1 Sqd W/P
security at 918825. |
|
|
|
|
|
|
|
|
|
Date 9 Sept
1944 Place 875885
& 400162 |
|
|
|
|
|
|
0800 |
Co. A |
S-3 |
1 Sqd at W/P
at 1 Sqd at W/P
at 1 Platoon
Jackpot Security. |
img033 |
|
Date 9 Sept
1944 Place 875885
& 400162 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
0800 |
Co. B |
S-3 |
|
2 Plat. in assigned work area. sweeping for mines and posting signs. |
|
|
|
|
|
0800 |
Co. C |
S-3 |
|
2 Plat. in work area. sweeping and
posting. |
|
|
|
|
|
1300 |
All Co’s |
|
|
LV bivouac
area for new area. |
|
|
|
|
|
1830 |
All Co’s |
|
|
Arrive in
biv. area at Coord. 402161. |
|
|
|
|
|
|
|
|
|
Date 10 Sept
1944 Place 400162 |
|
|
|
|
|
0800 |
Co. A |
|
|
1 Sqd.
security at W/P at Coord. 258093. |
|
|
|
|
|
0800 |
Co. C |
|
|
2 Plat. sweeping & posting in assigned work areas. |
|
|
|
|
|
|
|
|
|
Date 11 Sept
1944 Place 400162 |
|
|
|
|
|
0800 |
Co. A |
|
|
1 Sqd
security at W/P at 258093. 1 Sqd
security at W/P at .[sic] |
|
|
|
|
|
0800 |
Co. B |
|
|
2 Plat. sweeping roads and posting signs. |
|
|
|
|
|
0800 |
Co. C |
|
|
2 Plats. sweeping roads and posting signs. |
|
|
|
|
|
|
|
|
|
Date 12 Sept
1944 Place 400162 |
|
|
|
|
|
0800 |
Co. B |
|
|
In Area
Reserve |
|
|
|
|
|
0800 |
Co. C |
|
|
1 Plat.
& 1 squad sweeping roads. 2 squads
standing by awaiting call |
img03386 |
|
Date 12
Sept. 1944 Place 400162
& 59 7 17 4 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
|
0800 |
Co. A |
3& 1
Squads sweeping roads & posting signs. 2 Squads W/P Sec. |
|
|
|
|
|
|
|
|
|
Date 13
Sept. 1944 Place 400162
& 597174 |
|
|
|
|
|
|
0800 |
Co. A |
|
2 Platoons
sweeping for mines in assigned area. |
|
|
|
|
|
|
|
|
|
1 squad
water point security at at [sic] Esneux. |
|
|
|
|
|
|
0800 |
Co. B |
|
Entire Co.
in Area. |
|
|
|
|
|
|
0800 |
Co. C |
|
In Area. Lt.
Kahofer &
2 trucks to Jackpot. |
|
|
|
|
|
|
0800 |
Co. B |
|
Entire Co.
in Area. |
|
|
|
|
|
|
|
|
|
Date 14 Sept
1944 Place 597174
& 766299 |
|
0800 |
|
|
Bn. prepares
to move to new bivouac area. |
|
|
|
|
|
|
1100 |
|
|
Bn leaves
area (infiltration) for new biv. area. |
|
|
|
|
|
|
1830 |
|
|
Co. A 2 palts. [sic] sweeping &
posting 1 Sqd W/P sec. at Coord. |
|
|
|
|
|
|
|
|
|
Co. B 2
Plats. sweeping & posting |
|
|
|
|
|
|
|
|
|
Co. C 1
Plat. sweeping &
posting. |
|
|
|
|
|
|
|
|
|
Date 15 Sept
1944 Place 766299 |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Squad W/P
security at Coord 818259. |
|
|
|
|
|
|
0800 |
Co. B |
|
2 Plat. sweeping & posting. |
img03387 |
|
Date 15
Sept. 1944 Place 766299
|
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. C |
|
1 Plat. filling craters in road in assigned area. |
|
|
|
|
|
|
1300 |
Co. A |
|
1 Sqd
security at W/P at 900285 |
|
|
|
|
|
|
|
|
|
Date 16
Sept. 1944 Place 766299 |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd. W/P
security at Coord. 818259. 1 Sqd. W/P
security at Coord. 900285. 1 Plat. road maint. for hosp. unit. 1 Plat. returns from Jackpot security. |
|
|
|
|
|
|
0800 |
Co. B |
|
Co. in area.
1 Plat. is alerted. |
|
|
|
|
|
|
0800 |
Co. C |
|
1 Plat. road maint. |
|
|
|
|
|
|
|
|
|
Date 17
Sept. 1944 Place 766299 |
|
|
|
|
|
|
0800 |
Co A |
|
1 Sqd W/P
Sec. 1 Sqd. W/P
Sec. 1 Plat.
Group Sec. 1 Plat.
graveling road at Hosp. |
|
|
|
|
|
|
0800 |
Co. B |
|
1 Plat. repairing culverts & craters in area. |
|
|
|
|
|
|
0800 |
Co. C |
|
1 Plat. (Lt.
Grosch) demolishing pillboxes 1 Platoon
putting in culvert at Zwaifal. 1 Platoon
maint. fiords in area. |
img03388 |
|
Date 18
Sept. 1944 Place 766299
& 910280 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. A |
8128259-900285 |
2 Sqds W/P
Security 2 Sqds 51st
Hospital Ent. repair. |
|
|
|
904276 |
2 Sqds 46th
Hospital Ent. repair. |
|
|
|
|
|
|
0700 |
Co. B |
297th Engr. |
Attached to
297th Bn. |
|
|
|
|
|
|
0800 |
Co. C |
Assgd. Work
areas. |
1st Plat puting [sic] in culvert at Zwiefal. 2 Sqds of
2nd Plat. filling craters on M.S.R. 3rd Plat.
Maint fiords with 15th Engr. |
|
|
|
|
|
1300 |
|
C.O. |
Co. C |
Assgd. to 297th engr. as of 1300 hrs. |
|
|
|
|
|
|
|
|
|
Date 19 Sept
1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
818259 900285 766273 |
1 Sqd W/P
Sec. 1 Sqd W/P
Sec. 2 Sqds 51st
Hospital repairing entrance. 2 Sqds
installing culvert |
|
|
|
904276 |
2 Sqds 45th
Hosp. repairing entrance. |
|
|
|
|
|
|
0800 |
Co. B |
|
Attached to
297th Engr. Bn. |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
297th Engr. Bn. |
|
|
|
|
|
|
|
|
|
Date 20
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd
Jackpot Sec. 2 Sqds W/P
sec. 2 Sqds
moving vehicles in assigned work area. 2 Sqds
repairing roads and filling craters in assigned work area. |
img03389 |
|
Date 20 Sept
1944 Place 910280 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. B |
|
Attached to
297th Engr. (C) Bn. |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
297th Engr. (C) Bn. |
|
|
|
|
|
|
|
|
|
Date 21 Sept
1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
|
2 Sqds W/P security at ROTGEN & EUPEN. 1 sqd
Jackpto [sic] security 3 sqds moving vehicles. 1sqd
sweeping roads 2 sqds filling craters. |
|
|
|
|
|
|
0800 |
Co. B |
|
Attached to
297th Engr. (C) Bn. |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
297th Engr. (C) Bn. |
|
|
|
|
|
1045 |
Noxima |
Co. A |
|
4 Sqds Co. A
to construct bridge at VICHT. |
|
|
|
|
|
1400 |
|
Co. C |
|
2 Plats. relieved of assignment with 297. Co. C to move to new
bivouac area. |
|
|
|
|
|
1900 |
|
Co. A |
|
Class 40 DS
Bailey Bridge 60’ span completed. |
|
|
|
|
|
|
|
|
|
Date 22
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqds W/P
security 3 Sqds moving vehicles. 1 Sqd Bailey Bridge security 2 Sqds maint. of Bailey 1 Sqd sweeping roads. |
|
|
|
|
|
|
0800 |
Co. C |
|
2 Plats
building C1 40 Timber trestle bridge under C1. 40 Bailey bridge at VICHT. |
|
|
|
|
|
|
0800 |
Co B &
one plat. Co. C |
|
Attached to
297th |
img03390 |
|
Date 23 Sept
1944 Place 910280 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd. Co. A
at W/P security at ROTGEN. 5 Sqds
filling crater and repairing roads and mine-sweeping |
|
|
|
|
|
|
0800 |
Co. B |
|
Attached to 297
occupying 14 pillboxes. |
|
|
|
|
|
|
0800 |
Co. C |
|
1 Platoon
attached to 297th 1 Platoon
construction timber trestle bridge at VICHT. 1 Platoon
installing box culvert at ZWEIFAL. |
|
|
|
|
|
|
|
|
|
Date 24
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
(To be
Changed) |
1 Sqd. W/P
Sec. 4 Sqds repairing roads and filling craters. 1 Plat.
repairing roads 1 Sqd in
area. |
|
|
|
|
|
|
|
Co. B |
Rescinded |
Occupying
and destroying pillboxes. |
|
|
|
|
|
|
|
Co. C |
|
Defending 2
road blocks. 007368 001390. |
|
|
|
|
|
|
1030 |
Co. A |
1 Plat - - |
Maint. of Bailey Bridge at VICHT. 2 Sqds Maint
Rd. Lammersdorf (Crater at
960180 [sic] 2 Sqds Maint
9 Div. MSR ROTGEN TO VICHT. Construction
of Timber trestle bridge at VICHT. 1 Sqd Water
Point Sec. |
|
|
|
|
|
1200 |
|
Co. B |
|
In area – no
more work on bill boxes. Road maint
in assigned area. |
img03391 |
|
Date 25 Sept
1944 Place 910280 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd Water
Point Sec. 1 Plat. Constructing timber trestle bridge at VICHT. 1 Plat. maint of road LAMMERSDORF to ROTT 1 Sqd maint of 9th Div.
M SR Rotgen to Vicht. |
|
|
|
|
|
|
0800 |
Co. B |
|
Road maint
in assigned area. |
|
|
|
|
|
|
0800 |
Co. C |
|
Defending
road—blocks at 007363 and 001390. |
|
|
|
|
|
|
|
|
|
Date 26
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd water
Point security 2 Sgd [sic] culvert on M.S.R. 2 ½ Sqds
Bailey Bridge ½ Sqd security at B/B 1 Plat. B/B. |
|
|
|
|
|
|
0800 |
Co. B |
|
Road
maintenance in assigned area. 1 Plat.
Eupen-vervieres. 1 Sqd. Eupen
to Rotgen 1 Plat.
& 3 Sqds on corduroy road. Lt. Hollis. |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
297th Defending road blocks at Coords 007368 and 001390. |
|
|
|
|
|
|
1600 |
Co’s A, B, C |
|
3 men from
each Co. left for special storm-boat training. |
|
|
|
|
|
|
|
|
|
Date 27
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. A |
|
Co. moves
from biv. area in rear to Coord. 948369. 3 Sqds
const. timber trestle bridge at Vicht 2 Sqds repairing roads (Rotgen to
Vicht) 2 Sqds
installing culvert at 919297 |
img03392 |
|
Date 27
Sept. 1944 Place 910280 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
[sic] |
|
|
|
1 Sqd. water
Point security |
|
|
|
|
|
[sic] |
|
|
|
1 Sqd.
security in Co. Area. |
|
|
|
|
|
|
0800 |
Co. B |
|
6 Sgds [sic] road repair and maint. (Corduroy) North of Monschau. 3 Sqds. Road
repair & maint. Eupen to Rotgen. |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
297th Defending road blocks. |
|
|
|
|
|
|
|
|
|
Date 28
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. B |
|
Participating
in Jayhawk ceremony Ceremony at
1400 hrs. |
|
|
|
|
|
|
0800 |
Co. A |
|
1 Sqd water
Point Security. 2 Sqds
repairing culvert at 919297 3 sqds
maint. of 9th Div. MSR. and
filling crater holes. 3 sqds in
area as security. |
|
|
|
|
|
|
1030 |
C.O. Staff
& Co Cmdrs |
|
Meeting in
S-3 Dungeon. –
Discussion of new assignment. |
|
|
|
|
|
|
|
|
|
Date 29
Sept. 1944 Place 910280 |
|
|
|
|
|
|
0800 |
Co. C |
|
Attached to
Jackrabbit defending road blocks at Coord. 001390 & 007368. W/P Closes. |
|
|
|
|
|
|
1000 |
Bn. Hqs |
|
Bn. Hq moves
to Coord. 968357 Adv. C.P. |
|
|
|
|
|
|
1100 |
Bn. Hqs |
|
Set up in
new C.P. |
|
|
|
|
|
img03393 |
|
Date 29 Sept
1944 Place 910280
& 967357 |
|||
|
|
|||
IN |
OUT |
FROM |
TO |
REMARKS |
|
|
|
|
|
|
1200 |
1200 |
|
Unit
relieves Jackrabbit of assignment of occupation of road blocks in vicinity of
ZWEIFALL |
|
|
|
|
|
|
1425 |
|
|
Blocks #2,
#3, and #4 received Artillery fire. |
|
|
|
|
|
|
1440 |
|
|
Counter-battery
fire Co. “B” relieves Co “C” on posts #3, #4, #5. |
|
|
|
|
|
1800 |
|
Co B |
|
One fatality
reported at Post #5. |
|
|
|
|
|
|
|
|
|
Date 30
Sept. 1944 Place 967357 |
|
|
|
|
|
|
0800 |
Co’s A, B,
C, in Vic. ZWEIFALL |
|
|
|
|
|
|
|
|
|
Co. A |
|
Occupying
road-blocks at blocks #1 and #2. |
|
|
|
|
|
|
|
Co. B |
|
Occupying
road-blocks at blocks. #3, 4, #5. |
|
|
|
|
|
|
|
Co. C |
|
In Reserve –
Co Area. Reserve Co. |
img03394 |
||||
|
||||
Transcribed
by Bob Kipke – April 2013 |