April
16, 1925 to October 3, 1925
Cyclone
Digger April 16, 1925 repaired Roof
- Deck - cabin stanchion - corner strips repaired
shut down all
summer
June 13,
1925 Tug Mike Dougherty new furnance
- new short grate bars - coal box sheeted and on top #12 iron - Plank
shear repaired - Machinery repaired
August 17,
1925 building three 4 x 10 tables and six benches for
Banning Mine #2
August 28,
1925 Steamer Cruiser in at Ways Left
Scraper & Section Docks & one work flat
Moved House Boat and Cyclone Digger to Landing at Dravosburg ( Risher
Landing)
September 9th
to 12th, 1925 unloading chains and wire
lines off Bulldozer and Lumber out of Flat 1164 these
all came from Dock 6
September 9th
10th, 1925 building three 4 x 10 tables and
six benches for Banning Mine
Docked &
repaired a Bulldozer and Docked a Scraper for general repairs
this was the
last work I done at the Ways
Saturday October 3, 1925 was my last day
* *
*
*
*
*
*
* *
Click