March 1, 1923

Steamboat Building in Elizabeth, PA

A Journal of daily activities at the Elizabeth Marine Ways 1898 to 1925 

March 1, 1923

Home ] Up ] 1923 ] January 2, 1923 ] January 10, 1923 ] February 1, 1923 ] February 16, 1923 ] [ March 1, 1923 ] March 21, 1923 ] April 4, 1923 ] April 23,1923 ] May 1923 ] July 1923 ] August 1923 ] September 1, 1923 ] September 12, 1923 ] November 1, 1923 ] November 27,1923 ] December 1923 ]

 

 

This journal page has been typed.  To view the actual journal entry click on the image below.

 

February 26, 1923 to March 20, 1923


 

February 26, 1923  building 4 wheel barrows for Carnegie Steel

March 1, 1923  repairing pipe work  J.C. Risher

Steamer J.C. Risher   March 6, 1923   new 3/4 tie rod in coal box

Steamer Ranger  March 6, 1923  repairs to wheel and sliding doors at F. hatches

Barges and Flats  B 31 - B 83 - sunk B 95 - sunk B 63 - B 67

March 8, 1923  Cyclone Digger lifting spuds out of Collier #4

March 10, 1923  calking sides of Collier #4 and 4 flats from the water line up

March 12, 1923  J.C. Risher  repairs to sheave box and end of C. timber

March 10, 1923  unloading liners and grate bars out of RR Car P.&L.E. 31459

New Pump boat for Mines Dept 3'2" x 12' x 36(') with Cabin and skylight  finished March 26, 1923

March 19, 1923  puting fir sticks in the River 20 x 20 x 100

March 20, 1923 sawing 20 x 20 x 100 fir for Dock 6

February 26, 1923 to March 20, 1923

Click on image to view full page.

Back Home Up Next